Hotline Numbers:

+91 9289151047, +91 9811437895

Project Report on Paper Waste Recycling Plant

Project Report on Paper Waste Recycling Plant

35000 INR/Piece

Product Details:

X

Project Report on Paper Waste Recycling Plant Price And Quantity

  • 1 Piece
  • 35000 INR/Piece

Project Report on Paper Waste Recycling Plant Trade Information

  • 1 Piece Per Day
  • 2-3 Days
  • All India

Product Description

Project Report on Paper Waste Recycling Plant

Paper Waste Recycling Plant

The recovery of waste paper is traditional in the paper and paper board manufacturing industry. The importance of utilisation of waste paper in the paper and board industry should not be under estimated. It furnishes about 30 per cent of all the fiberous raw materials consumed in the paper and board mills in the U.S.A. Europe and Japan. The establishment of the local manufacture of paper board in a country after proceeds that of paper pulp. In this case, waste paper is one of the first sources of  fiberous material  to which resources is taken to reduce the purchase of the pulp. Waste paper in fact, a source of prepared fibre which needs only to be placed in suspention in water in order to obtain a pulp, making possible the formation of sheets of paper or paper board a very simple treatment which is within the ability of artisans. The utilisation of waste paper supplements of a great extent the overall fibre requirements in any conuntry, every possible attempt should be made to recover waste paper for its being reconverted into paper, specially in those regions where it is difficult to get sufficient and cheap raw materials for manufacture of paper and paper boards. It may be reasonably anticipated that the rate of recovery of waste paper will gradually increases to a maximum of 35 per cent speciallq in those countries which have a lower figure recovery today. Measures to increases recovery of waste paper such as propoganda on the value of waste paper etc. though the establishment of waste paper association are very essential and timely section should be initiated to save the fibrous material from decay or destruction.

Cost Estimation
Plant Capacity  50 Ton/Day
Land & Building (Area 10 Acres)  Rs. 23.23 Cr.
Plant & Machinery  Rs. 4.15 Cr.         
W.C. for 3 Months  Rs. 10.86 Cr.           
Total Capital Investment  Rs. 39.12 Cr.              
Rate of Return  33%   
Break Even Point 48%

Note: ITI can modify the Capacity and Project Cost based on your requirement.

Contents of the Project Reports

Introduction
Uses and Applications
Properties
Market Position
Present Manufacturers
Detailed Process of Manufacture
Formulations
B.I.S. Specifications
Process Flow Sheet Diagram, Plant Layout,
Cost Economics with Profitability Analysis
Capacity
Land & Building Requirements with Rates
List & Details of Plant and Machinery with their Costs
Raw Materials Details/List and Costs
Power & Water Requirements
Labour/Staff Requirements
Utilities and Overheads
Total Capital Investment
Turnover
Cost of Production
Break Even Point
Profitability
Land Man Ratio
Suppliers of Plant & Machineries and Raw Materials
Cash Flow Statement
Repayment Schedule
Interest Chart
Depreciation Chart
Projected Balance Sheet for 5 Years etc.
Enter Buying Requirement Details
Email Id
Mobile number

Other Products in 'Project Report on Waste Management' category



Account Holder Name: Industrial Technologies, India

Current Account Number: 3312 1123 908

IFSC/NEFT/RTGS Code : SBIN0001273

MICR CODE : 110002141

Bank Address: State Bank of India, Hauz Quazi, Delhi 110006, India

Back to top